Apart from Glass Flow , we have some situations in production postings where we don't have any packed items but we have production of melted that becomes cullet.
In these cases we need to:
- Calculate the amount of melted that we need to make cullet.
- Production of Cullet 531 to the work order of melted.
After we calculate the melted = culllet we have to produce , we need to make a MIGO transaction with the following characteristics:
Then you need to put the correct date and description. Also you need to delete the lines that the system brings automatically. These come from the BOM of Melted:
Create a new line for cullet item
And then put the necessary data:
- Item: R-2400302009
- Quantity
- Plant
- Storage Location
- Order
The final picture should be something like that:
If all data are correct, then you only have to make a CHECK and then POST.
Recommended Comments
There are no comments to display.
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now